News

Photovoltaic system in operation

A few weeks ago, we commissioned our photovoltaic system.
The installation consists of 297 solar panels covering an area of approximately 510 m². With this system, we cover around 65 % of our total energy needs.

Aspects of sustainability and environmentally conscious practices are increasingly being integrated into our work. A few weeks ago, we commissioned our photovoltaic system. The installation consists of 297 solar panels covering an area of approximately 510 m² and generates 92.000 kWh of green electricity annually. This corresponds to a yearly reduction of 43 tons of CO2 emissions.

With this system, we cover around 65 % of our total energy needs. Additionally, our electrically powered company vehicles and electric industrial trucks, such as forklifts and pallet trucks, are fully supplied with PV power through the 10 charging stations.

keine Suchergebnisse
1 SuchergebnisSuchergebnisse
XS
SM
MD
LG
XL
XXL